The Access All Areas
Specialists
Strand Jack Access Mast Climber
12Oct 2012

Mastclimber access for strand jack crew to access crane top sides during heavy lifting operations.

Mastclimber configuration required specialised tie components to be designed specifically for this application. Triangular box truss columns were utilised to enable bespoke tie conifiguration.

Access and egress from the mastclimber were only permitted at ground level, and top level, interlock gates were rigged to facilitate safe access and egress at the upper level.

0 COMMENTS
Add a Comment
Categories
Archives